Àá½Ã¸¸ ±â´Ù·Á ÁÖ¼¼¿ä. ·ÎµùÁßÀÔ´Ï´Ù.
KMID : 0371819990310010068
Nuclear Engineering and Technology
1999 Volume.31 No. 1 p.68 ~ p.79
Containment Closure Time Following the Loss of Shutdown Cooling Event of YGN Units 3&4
Seul, Kwang Won
Bang, Young Seok/Kim, Hho Jung
Abstract
The YGN Units 3&4 plant conditions during shutdown operation were reviewed to identify the possible event scenarios following the loss of shutdown cooling (SDC) event. For the five cases of typical reactor coolant system (RCS) configurations under the worst event sequence, such as unavailable secondary cooling and no RCS inventory makeup, the thermal hydraulic analyses were performed using the RELAP5/MOD3.2 code to investigate the plant behavior following the everit. The thermal ¢¥hydraulic analyses include the estimation of time to boil, time to core uncovery, and time to core heat up to determine the containment closure time to prevent the uncontrolled release of fission products to atmosphere. The result indicates that the containment closure is recommended to be achieved within 42 minutes after the loss of SDC for the steam generator (SG) inlet plenum manway open case or the large cold leg open case under the worst event sequence. The containment closure time is significantly dependent on the elevation and size of the opening and the SG secondary water level condition. It is also found that the containment closure needs to be initiated before the boiling time to ensure the survivability of the workers in the containment. These results will provide useful information to operators to cope with the loss of SDC event.
KEYWORD
FullTexts / Linksout information
Listed journal information