Àá½Ã¸¸ ±â´Ù·Á ÁÖ¼¼¿ä. ·ÎµùÁßÀÔ´Ï´Ù.
KMID : 0371820020340050421
Nuclear Engineering and Technology
2002 Volume.34 No. 5 p.421 ~ p.432
Direct ECC Bypass Phenomena in the MIDAS Test Facility During LBLOCA Reflood Phase
Yun, B.J.
Kown, T.S./Euh, D.J./Chu, I.C./Park, W.M./Song, C.H./Park, J.K.
Abstract
KEYWORD
DVI, reflood, direct bypass, APR-1400, modified linear scaling method
FullTexts / Linksout information
Listed journal information