Àá½Ã¸¸ ±â´Ù·Á ÁÖ¼¼¿ä. ·ÎµùÁßÀÔ´Ï´Ù.
KMID : 0385919940050020313
Journal of the Korean Society of Emergency Medicine
1994 Volume.5 No. 2 p.313 ~ p.328
Evaluation of a Mock Disaster at Wonju City
¾È¹«¾÷
ÀÓ°æ¼ö/Ȳ¼º¿À/ÀÌÁø¿õ/±è¼±¸¸/ÀÌ°­Çö/±è¿µ½Ä/À̺μö/°­¼ºÁØ
Abstract
To initiate an EMS(Emergency Medical System)-based disater plan at Wonju city )population: 170,000), a mock disaster was developed and carried out. The scenario involved a mock train derailment near Wonju Station resulting in 40 casualties
(status:
5
dead, 4 urgent, 10 moderate, and 21 non-urgent). The duties of the disaster relief team were determined by the specific situation at that time. The mock disaster was carried out at the Wonju Station plaza on April 29th, 1994 from 2 to 4 PM. The
mock
disaster was evaluated by timing each level of response and after completion of the simulation, a meeting was held for discussion.
@ES The following results were obtained.
@EN 1. The reaponse time for reaching the site was; disaster relief team 6 minutes, emergency relief team 10 minutes, medical support team 20 minutes, and military support team 25 minutes.
2. The time interval from triage (citical, emergency treatment needed patients) to emergency treatment was 80 minutes and was due to the small number of emergency and medical support personnel.
3. The time interval from triage to transportation:
(1) Twenty minutes from start of exercise to 110 minutes for the last patient.
(2) Urgent patients: First was evacuated after 20 minutes and the last after 80 minutes (average: 42.5 minutes). The critical patient transported after 80 minutes was trapped inside a structure, and therefore time consuming.
(3) Moderate patients: First was after 30 minutes and last was 85 minutes (average: 56 minutes).
(4) Non-urgent: First was after 35 minutes and last was 110 minutes (average: 90 minutes). All were transported by bus, two were evacuated by ambulance after misjudgement by the emergency personnel.
(5) The dead were transported by truck after all living patients were transported.
4. Points discussed at evaluation meeting:
(1) The current Winju city's disaster relief personnel lack systematic trainig.
(2) The fire department does not have a specialized relief team, and are lacking in emergency aid techniques and equipment.
(3) The police department lacks plans for guiding emergency vehicles and controlling the disaster site.
(4) The military hospital had in sufficient and outdated medical equipment, and cooperation with the medical team was poor.
(5) There was a definite need of more emergency relief personnel and more training was needed in triage.
(6) Cooperation between our medical personnel and the military medical personnel was insufficient.
(7) The recognition of critical patient tags by the relief personnel was inadequate.
(8) Communication between the relief teams was problematic due to the absence of a wireless communication system.
@ES Conclusion:
@EN For an effective simulated disaster relief exercise at Wonju city, all relief teams need adequate and sufficient equipment with a systematized training program consisting of a joint exercise at least twice a year. Sufficient emergency relief
personnel with adequate equipment should decrease the time consumed at triage and emergency treatment.
KEYWORD
FullTexts / Linksout information
Listed journal information
ÇмúÁøÈïÀç´Ü(KCI) KoreaMed ´ëÇÑÀÇÇÐȸ ȸ¿ø