Àá½Ã¸¸ ±â´Ù·Á ÁÖ¼¼¿ä. ·ÎµùÁßÀÔ´Ï´Ù.
KMID : 0895420090190010008
Journal of Korean Society of Occupational and Enviromental Hygiene
2009 Volume.19 No. 1 p.8 ~ p.15
Kim Ji-Yeong

Phee Young-Gyu
Lee Song-Kwon
Lee Jung-Hee
Lim Moo-Hyuk
Kang Sung-Wook
Abstract
This study was examined to find out asbestos exposure level the factors which affected the level at asbestos abatement sites. We visited a total of thirteen building demolition sites(3 apartments, 3 schools, 4 stores, and 3 houses) were visited to collect samples and related data from August to November, 2006. The results of this study were as follows 1. The results of an analysis of bulk samples to identify types of asbestos at the asbestos abatement sites showed that the kinds of the asbestos detected were chrysotile by 50.0%, were tremolite by 2.6%, and were the contents of chrysotile by 3 to 20%. 2. The geometric mean concentration of asbestos was 0.007 f/cc(range 0.001-0.34 f/cc) and its geometric standard deviation was 5.83. Of the samples, however, 12 exceeded the Korean Occupational Exposure Limit(0.1f/cc). 3. Of the materials, textile material had the highest concentration with geometric mean of 0.016 f/cc. When asbestos-containing materials were removed using T type tools, the geometric mean concentration of asbestos was 0.061 f/cc. The level by this method was much higher than by other removal methods. In analysis by the type of building, the geometric mean concentration of asbestos in stores was 0.042 f/cc and was higher than in other buildings. 4. The Poisson regression analysis was applied to find out the factors that affect the airborne asbestos concentration. As a result of the analysis, removal using a T type tool was the most important factor affecting the asbestos concentration(p<0.01). In conclusion, the airborne asbestos concentration(geometric mean) in asbestos abatement sites was 0.007 f/cc(0.001¡­0.34 f/cc), and 12(14.6%) of all samples were over the 0.1 f/cc. These results showed that asbestos abatement workers have been exposed to the high level of airborne asbestos because they have not been keeping asbestos removal rule. In accordance with increases of the number of building demolition sites, the better government regulation on asbestos abatement methods should be made and be performed well at building demolition sites.
KEYWORD
Asbestos, Asbestos containing materials, Abatement methods
FullTexts / Linksout information
Listed journal information
ÇмúÁøÈïÀç´Ü(KCI)