Àá½Ã¸¸ ±â´Ù·Á ÁÖ¼¼¿ä. ·ÎµùÁßÀÔ´Ï´Ù.
KMID : 1024520050140070675
Journal of the Environmental Sciences
2005 Volume.14 No. 7 p.675 ~ p.681
Simultaneous Removal of Phosphorus and Nitrogen by Intermittently Aerated Activate Sludge combined with Aluminum Corrosion
Cheong Kyung-Hoon

Choi Hyung-Il
Jung Oh-Jin
Park Sang-Il
Kim Woo-Hang
Abstract
laboratory experiment was performed to investigate phosphorus and nitrogen removal from synthetic wastewater by intermittently aerated activated sludge process packed with aluminum and silver plate. Three continuous experi¡©mental processes, i. e. an intermittently aerated activated sludge process(Run A), an intermittently aerated activated sludge process with an aluminum and silver plate packed into the reactor(Run B), and a reactor post stage(Run C) were compared. In the batch experiments, the phosphorus removal time in the reactor packed with aluminum and silver plate simultaneously was faster than that of the reactor packed with only an aluminum plate. More phos¡©phorus was removed with an increase of NaCl concentration. The pitting corrosion of aluminum does not affect the performance of the biological treatment. The total nitrogen removal efficiency in Run B was at the HRT of 12 and 6 hours respectively. The effluent concentration as low as 1.0 mg/L could be ob¡©tainable through the continuous experiment in Run B at HRT of 6 hours.
KEYWORD
Phosphorus, Nitrogen, Aluminum corrosion, Intermittently aerated activated sludge
FullTexts / Linksout information
Listed journal information
ÇмúÁøÈïÀç´Ü(KCI)