Àá½Ã¸¸ ±â´Ù·Á ÁÖ¼¼¿ä. ·ÎµùÁßÀÔ´Ï´Ù.
KMID : 1041219690100010099
Journal of Sericultural and Entomological Science
1969 Volume.10 No. 1 p.99 ~ p.105
Analysis of the Korean Filatures Management
Choe Byong-Hee

Nahm Joong-Hee
Abstract
The results of investigation and management analysis for the silk filatures in Korea until 1968 are evaluated as followings. (1) The average cocoon purchasing amount for a filature was found as 10,800kg and they are processed 105kg per man on the cocoon assorting process, 8,683kg per day during the drying process of which 42 percent are dried with low temperature drying system. (2) The average cocoon cooking capacity is 50 g, cocoon per minute, but the cooking capacity per man is smaller in case of larger factory. (3) The silk production capacity per month per a filature is 6,000kg and the amount gets smaller in case of larger factory. (4) The employee cost per one kg of raw silk production was found as high in smaller factory and it was found that 200~300 sets size was the optimum capacity for operation. (5) In case of multiends silk reeling machine, the employee cost for the silk reeling process acts as the most peculier factor among six different cocoon processes and it is reached to conclued to deduct the number of employees for this process in order to deduct the production cost. (6) The correlation coefficients between cost factors and total labour cost was found as 46 percent, therefore the rest (54£¥) will be the production cost other than labour cost.
KEYWORD
FullTexts / Linksout information
Listed journal information