Àá½Ã¸¸ ±â´Ù·Á ÁÖ¼¼¿ä. ·ÎµùÁßÀÔ´Ï´Ù.
KMID : 1171820080230040065
Journal of Environmental and Sanitary Engineering
2008 Volume.23 No. 4 p.65 ~ p.71
Evaluation on Actual Discharge Data for TMDL in Nakdong River Basin
Kim Gyeong-Hoon

Kim Yong-Seok
Park Bae-Kyung
Yoon Jong-Su
Shin Chan-Ki
Abstract
To drive efficiently total water pollution load management, needs to calculate the exact load emissions, pollution load allocation and implementation evaluation in each unit area of watershed and accurate and regular flow of data. For these reasons, the Nakdong River TMDL Research Center has produced directly or indirectly in the average interval of eight days (30 times or more / year) 41 points for unit area of the total water pollution load management and 8-point of municipal requirement for a total of 49 branches as a flow data in 2004 from August. This acquired the survey flow is evidence of trends and changes each point in the Nakdong River based on time, such as 10 years based on average design flow available to the foundation of the summit as the major water policy is to be utilized. This study was performed on actual discharge measuring data and introduced performance results each drainage basin of Nakdong River from 2004 to 2008 over the total of past five years.
KEYWORD
TMDLs, Standard flow, Velocity measuring line, Maximum section discharge rate, Total uncertainty
FullTexts / Linksout information
Listed journal information